/

Milestone Achievement by NTDC: NTDC Board of Directors approves Grid Code 2022

Lahore, July 26, 2022 (PPI-OT):Today marks a big day and milestone achievement by NTDC, the Board of Director NTDC has approved draft Grid Code 2022 for onward submission to National Electric Power Regulatory Authority (NEPRA). The Grid Code is prepared on international standards by NTDC team, which is an essential requirement of the regulation of electric network supply and delivery system.

NTDC team has completed the revised Grid Code in the light of upcoming CTBCM market, new technologies, new voltage levels and increased penetration of Renewable Energy in Pakistan’s Power Sector including KE.

The Chairman BoD, Mr. Naveed Ismail, appreciated the strenuous efforts of the team which prepared the Draft Grid Code 2022. Managing Director NTDC Dr. Engr. Rana Abdul Jabbar Khan also highlighted the synergy and commitment of the team how they took this challenging task in a difficult situation and managed to produce quality document based on international standards.

For more information, contact:
Director Media and PR, NTDCL
National Transmission and Despatch Company Limited (NTDCL)
221 WAPDA House Lahore, Pakistan
Tel: +92-42-99201020, +92-42-99202211 Ext: 2286
Cell: +92-321-478251
Fax: +92-42-99210894
Email: itdir@ntdc.com.pk
Website: http://www.ntdc.com.pk/